Architectural Design Process for a Long Island Custom Home
By Lior Golan, Founder, Prestige Custom Building & Construction. Last updated November 2026.
Architecture is where every project we take on starts, whether it’s a whole-home renovation or a new house on an empty lot. Before anyone prices framing or picks tile, a licensed architect turns your lot, its rules and your wish list into drawings. That’s the architectural design process. What happens first, and why isn’t it one meeting?
The American Institute of Architects describes an architect’s basic services as a sequence of phases (AIA, 2023). Here’s what happens in each one on a Long Island custom home, what you decide, and where the builder comes in.
Key Takeaways
- The AIA lays out an architect’s basic services in 5 phases: schematic design, design development, construction documents, bid or negotiation, and construction (AIA, 2023).
- Interior finishes are the largest share of construction cost, 24.1% in NAHB’s 2024 national survey (NAHB, 2025), so the material choices made during design carry real weight.
- New York’s permit rules ask, where applicable, for evidence that a licensed and registered architect or professional engineer prepared the construction documents (NY Department of State, 2022).
- On projects that start with us, architecture is by our licensed architect partners, who design and seal the plans. Prestige coordinates their work and builds the house.
What Is the Architectural Design Process for a Custom Home?
It’s the sequence of phases in which a licensed architect turns your needs, your lot and your budget into drawings a building department can approve and a builder can build. The AIA names 5 phases, from schematic design to construction (AIA, 2023).
New York’s State Education Department lists the same ground: consultation, evaluation, planning, preliminary studies, designs, construction documents and management, and administration of construction contracts (NYSED Office of the Professions). The AIA treats programming as the opening step of schematic design. It gets its own row below because it’s where you do most of the talking.
| Phase | What happens | What you decide | What comes out of it |
|---|---|---|---|
| Programming | The architect learns your goals and requirements | The rooms, their sizes, how you live | A program with estimated square footage for each use |
| Schematic design | Study drawings of layout, scale and form; zoning research | How the house sits on the lot | Site plan, floor plans, sections, an elevation, a cost estimate |
| Design development | Structural, mechanical, electrical and plumbing details laid out | Material types, window and door locations | Fully dimensioned drawings, outline specifications |
| Construction documents | Full detail and specifications | The selections the set still needs to name | A set to price and build from |
| Permits, bid or negotiation | Filing, and pricing by contractors where there’s a bid | Who builds it, on what terms | A permit and a construction contract |
| Construction | The architect helps the contractor build what was specified | Answers to site questions | The finished house |
None of these phases is a formality. Each settles questions the next depends on, which is why the custom home design process takes real work.
What Happens Before the Architect Starts Drawing?
You and the architect write down what the house has to do. The AIA calls this the program, the required functions of the project, and says it should include the estimated square footage of each usage type (AIA, 2023).
NYSED’s advice is to make your requirements known as clearly and as thoroughly as possible, so your architect can design to suit both your budget and your needs (NYSED Office of the Professions). In practice that’s a list: the rooms, who uses them, and what you’d change about the house you live in now.
When someone comes to me with a lot and no drawings, I ask for the survey and that list. New York’s permit rules call for a site plan drawn in accordance with an accurate boundary survey (NY Department of State, 2022). Still choosing land? Read how to choose the right lot for a custom home, and bring our questions for a design consultation.
What Happens in the Schematic Design Phase?
The architect turns the program into study drawings that show spatial relationships, scale and form, and you agree on a final schematic design before anything is detailed (AIA, 2023). The AIA also calls it the research phase, when zoning requirements or jurisdictional restrictions are discovered and addressed.
On the North Shore, that means the zoning that applies to the lot, the setbacks, and, in some villages, architectural review board approval. On a waterfront lot in Sands Point or Lloyd Harbor, the permit site plan has to show, as applicable, flood hazard areas and design flood elevations (NY Department of State, 2022), so read building in a flood zone on the North Shore early.
The AIA says this phase often produces a site plan, floor plans, sections, an elevation, and computer images, renderings or models, with costs estimated from the overall project volume. This is the phase to move walls. Later, a moved wall means redrawing the structure, the systems and every detail that depends on it. Style gets settled here too; see North Shore house styles, from Shingle Style to Georgian.
Render design is a separate, paid package. Our render design team builds 3D renderings of your home from the architect’s drawings, so you can walk through the rooms before the plans are filed, while a change still means changing a drawing.
What Gets Decided in Design Development?
The engineering and the materials. Design development takes the schematic drawings a step further, lays out the mechanical, electrical, plumbing, structural and architectural details, and often specifies material types and where windows and doors go (AIA, 2023). It often ends with a formal presentation to, and approval by, the owner.
Why does it carry so much weight? Interior finishes were the largest share of construction cost in NAHB’s 2024 survey, at 24.1%, followed by major system rough-ins at 19.2% (NAHB, 2025). Those are national averages, but the choices behind them get made on paper, during design.
Interior architecture is worked out here too: millwork, lighting, fixtures and the finish schedule. On our projects that’s a collaboration between our licensed architect partners and our render design team; see how interior architecture is coordinated with the architect’s design.
This is also where I want a builder reading the drawings. A beam that doesn’t fit the ceiling height is a fix on paper now and a problem on site later. I’d rather prices sit next to the selections while they’re still choices.
Want the whole sequence in one place? Our free custom home planning guide covers the 5 steps before construction, the build in 8 phases and 12 questions to ask any builder.
What Goes Into the Construction Documents?
Everything a contractor needs to price and build the house. The AIA says this phase produces a set of drawings that include all pertinent information required for the contractor to price and build the project, typically with specifications for construction details and materials (AIA, 2023).
Here’s why it takes real work. Every dimension, connection and system has to agree across the architect’s sheets and the engineers’. The AIA notes the level of detail may vary with the owner’s preference. Every blank in a set is a decision someone makes later.
When the set is done, the architect seals it. NYSED says an architect’s seal and signature indicate that a licensee is responsible for the work (NYSED Office of the Professions). Already holding a set from your own architect? Read what a builder needs to price your architect plans.
Where Do Permits and Pricing Fit In?
They come after the construction documents. A New York building department shall not approve construction documents unless they show, where applicable, the structural, electrical, plumbing, mechanical and other service systems, an Energy Code compliance statement, a site plan from an accurate boundary survey, and evidence that a licensed and registered architect or professional engineer prepared them (NY Department of State, 2022).
Our guide to the Long Island custom home permit process covers the approvals that can sit on top of it. In the AIA’s sequence, the finished set then goes to contractors for bids, and any negotiation on price or scope should happen before the construction contract is signed (AIA, 2023). On projects that start with us, the builder is at the table from the first drawings, so pricing runs alongside design instead of waiting for a bid round.
What Does the Architect Do During Construction?
They help the builder build what was drawn. The AIA describes construction-phase services as helping the contractor build the project as specified in the construction documents the owner approved, including sketches that clarify questions raised on site (AIA, 2023). Those services are at the owner’s discretion, so decide what you want from this phase before the design contract is signed.
As the builder, I build what’s drawn and coordinate the trades. When a question on site would change the design, it goes back to the architect who sealed the drawings. For the full split of roles, see who does what between the architect and the builder.
How Do the Architect, the Render Team and the Builder Split the Work?
Our licensed architect partners design and seal the plans, our render design team produces the 3D renderings and works through materials and finishes with you, and Prestige coordinates the process and builds the house. I typically price that work as 3 packages: construction management, architecture by our licensed architect partners, and render design.
| Package | Who does the work | What it covers |
|---|---|---|
| Architecture | Our licensed architect partners | The design and the sealed plans |
| Render design | Prestige’s render design team | 3D renderings of your home, with materials and finishes in the model |
| Construction management | Prestige | Managing the trades and building the house |
The same phases apply to a new custom home on your lot and to a whole-home renovation of an existing house, where the house you have becomes part of the program. Our new homes start from $1.5M, and renovations from $500K. See how a project runs from the first conversation through construction.
Frequently Asked Questions
What are the phases of architectural design?
The AIA describes 5: schematic design, design development, construction documents, bid or negotiation, and construction (AIA, 2023). Programming, where you and the architect define what the house has to do, happens at the start of schematic design. In New York, the building permit comes between the construction documents and construction.
What’s the difference between schematic design and design development?
Schematic design settles the concept: study drawings of layout, scale and form, plus research into zoning and other restrictions. Design development takes those drawings a step further, laying out the structural, mechanical, electrical, plumbing and architectural details, and often specifying material types and window and door locations (AIA, 2023).
Do I need an architect to build a house in New York?
Usually you need a licensed design professional, such as an architect, any time a construction project needs a government agency’s approval (NYSED Office of the Professions). The licensing law exempts residence buildings of 1,500 square feet or less, not counting garages, porches and similar areas, but a community can still require a seal (NYSED Office of the Professions).
What does an architect’s seal on the plans mean?
It means a licensee is responsible for the work (NYSED Office of the Professions). NYSED also says sealed drawings must carry a warning that it’s a violation of the law for anyone to alter them unless acting under the direction of a licensed architect. That’s why a design change goes back to the architect, not to the builder.
Can I hire an architect for only part of the design process?
Yes. NYSED says you may limit your contract to project planning and preliminary architectural design services, or extend it to include the preparation of construction documents, construction observation and inspection services (NYSED Office of the Professions). Whichever you choose, make sure the written contract describes the deliverables and who files with the building department.
If you have a lot or a house to replace, and no drawings yet, you’re at the start of this process. That’s the best time to talk, before anything gets drawn. I’ve spent 30+ years building on Long Island. Book a consultation with me and bring the survey, your list and your questions.